|
Objective |
Who is responsible |
Who is involved |
Activity |
Cost |
Training |
Success criteria |
Completion date |
|
To share the expertise of staff across the schools in Cleethorpes |
CL |
LAP schools |
|
Identify particular areas of expertise across LAP school
(start with SEN). |
|
Identify needs across LAP schools through survey. |
|
Match supply and demand |
|
Introduce Survey to LAP schools interested at LAP meeting. |
|
Monitor process. |
|
|
|
|
Survey has been introduced to school interested. |
|
Surveys have been completed by interested schools. |
|
Strengths across LAP have been identified. |
|
Supply has been matched with demand. |
|
July ‘07 |
|
To ensure that all pupils identified as being at risk of dyslexia
are receiving support. |
EE / AB |
Staff Change team |
|
Teachers identify children who they believe to be at risk of
dyslexia (start with year 3). |
|
Test children and if necessary take action. |
|
Identify additional children at levels 2C or less and carry
out BPVS initially and if necessary DST. |
|
Appoint TA to deliver MSL programme 22 hrs per week. |
|
Level 3 TA costs for 22 hrs |
Continual training of TA.
Possible training of additional TA to carry out BPVS testing. |
|
Children are identified as being at risk of dyslexia. |
|
Action is taken for those children who are at risk for
dyslexia. |
|
Other children have been identified. |
|
BPVS test has been carried out. |
|
Pupils at risk of dyslexia are having support through MSL
programme. |
|
July ‘07 |
|
To ensure that underperforming pupils in maths are receiving
support. |
EE / HT / DM |
All staff
Change team |
|
Teachers identify children who they believe to be possibly
Dyscalculic (start with year 3). |
|
Test children and if necessary take action. |
|
Identify additional children at levels 2C or less and carry
out Dyscalculia test. |
|
Appoint TA to plan and deliver specific maths programme 10
hrs per week. |
|
Level 3 TA costs for 10 hrs |
Continual training of TA.
Possible training of additional TA to support teaching of maths
group. |
|
Children are identified as possibly Dyscalculic. |
|
Testing is carried out. |
|
Action is taken for those children who are dyscalculic. |
|
Other children have been identified and tested. |
|
Pupils identified as Dyscalculic are having a specific maths
programme taught. |
|
July ‘07 |
|
To ensure that staff expertise is being shared across the school |
EE / CL / MW |
All staff
Change team
|
|
Appoint staff to deliver OT and S&L programme. |
|
Staff to deliver programme across school. |
|
TA trained to deliver IEPs in maths. |
|
TAs support pupils in Numeracy. |
|
Progress of pupils is closely monitored. |
|
Level 3 TA costs for 3 hours |
Training for all TAs in carrying out IEPs in Numeracy.
Training for specific staff employed to deliver OT and S&L
programmes. |
|
Staff are appointed and timetabled to deliver IEPs in OT and
S& L |
|
Training has been delivered and skills employed during IEPs
in maths. |
|
TAs are supporting pupils in Numeracy. |
|
Expected progress is being made by pupils. |
|
July ‘07 |
|
To enhance facilities in the playground to ensure positive
experiences for all children during break and lunchtime. |
CL / ES / CR |
All staff
Change team
|
|
Purchase basket ball posts and concrete into playground. |
|
Purchase a range of smaller pieces of equipment for children
to play group games. |
|
Use TAs / lunchtime supervisors to demonstrate games to
children. |
|
Provide quiet areas around school with canopies for shade. |
|
Put markings on the playground for children to use for
games. |
|
Produce a rota and leaders for different year groups to play
games |
|
Level 3 TA costs for 3 hrs |
In house training by trainee social worker on developing playground
activities.
On-going training for lunchtime supervisors.
|
|
Basket ball posts have been purchased and concreted into
playground. |
|
Small pieces of equipment have been purchased and stored in
separate containers. |
|
TAs and lunchtime supervisors demonstrate games to children
and monitor the use of the playground equipment. |
|
Quiet canopied areas have been put into place around school
grounds. |
|
Markings have been put on playground. |
|
A rota has been put together for the use of playground
equipment. |
|
July ‘07 |
|
To improve communications across the school, to parents and
visitors. |
CL |
Governors
Change team
|
|
To install touch screen information system in the entrance,
which, provides parents with a map of the school and other
important information. |
|
Provide piped music in the entrance. |
|
Cost of computerised system |
SMT / technician training on how to update system and install
information. |
|
Touch screen system has been installed in entrance. |
|
Piped music is available in entrance. |
|
Information system is useful to parents and visitors. |
|
July ‘08 |
|
To provide (Y5) children with portable computer equipment.
Computer equipment used for teaching and learning across the
curriculum. |
CL |
Change team |
|
Portable computer equipment has been purchased.
|
|
Teachers and pupils are using equipment across all
curriculum areas. |
|
Cost of portable equipment |
|
|
Equipment has been purchased.
|
|
Equipment is being used for learning across curriculum
areas. |
|
|
|
Wish list major items: |
Art room, Mini bus |